Flood risk assessment and modelling for Ghana and West Africa

I am a UK-based flood risk specialist, and I have already screened all 260 districts of Ghana for river flooding and the whole 566 km coast for extreme sea levels. I can work for government agencies, district assemblies, NGOs, development partners and engineering firms, remotely or in-country.

  • 13 Act districts
  • 247 other districts

How to read this: the orange districts stay in Ghana’s top 20 for modelled river flood damage to homes under all nine combinations of assumptions I tested. Grey does not mean safe. River flooding only; not an official priority list.

districts of Ghana screened for river flood damage to homes and for people exposed
260
of Ghana’s coast screened for extreme sea levels, in 57 sections of about 10 km
566km
agreement score between the flood maps behind my national screen and the satellite-mapped White Volta flood of September 2020 (1 = perfect)
0.58
years at England’s Environment Agency, 2019–2025: flood modelling, flood warning, planning advice and funding
6

Who can carry out a flood risk assessment in Ghana?

Hisham Nuhu is a UK-based flood and disaster risk specialist who has already built a national river flood screen of all 260 districts of Ghana and a screen of its coast. He worked at England’s Environment Agency from 2019 to 2025 and holds an MSc in Water Science, Policy and Management from the University of Oxford.

That is me. Flood risk work in Ghana is usually done by consulting firms, university teams and individual specialists, often inside a larger project. What I bring is a national picture that already exists, and six years of turning flood evidence into decisions in England: modelling a village river, issuing flood warnings on duty, advising on planning applications and helping councils fund flood schemes.

I work alone or inside a team. Some clients want a short, focused piece of analysis. Others need a hydrologist or flood risk specialist named in a bid.

Government agencies and ministries
A national or regional screen to set priorities, and terms of reference for the detailed studies that follow.
Metropolitan, municipal and district assemblies
What the national screen says about your district, and what a local study would need to answer.
NGOs and humanitarian teams
Where the people most exposed live, children and older people included, to plan preparedness work.
Development partners’ country offices
Evidence for project preparation and appraisal, or an independent review of a consultant’s flood model.
Engineering and consulting firms
A hydrologist or flood risk key expert for a bid, with a CV in the format the client asks for.

What has already been done for Ghana’s 260 districts?

I modelled river flood damage to homes and the people exposed in every district, then tested which priorities hold under nine combinations of assumptions. Thirteen districts stay in the national top 20 every time, most of them on the lower Volta and around Accra. I also screened the 566 km coast for extreme sea levels.

I call the thirteen the Act districts: Ningo/Prampram, Keta, South Tongu, Ketu South, Weija Gbawe, Ada East, Anloga, North Tongu, Ada West, Central Tongu, Shai Osudoku, Shama and Asuogyaman. Act means appraise first, with a local study and the communities affected. It does not mean stop building.

I checked the flood maps against the White Volta flood of September 2020, mapped by satellite. They matched well enough to use, and the test showed where the flood edge was uncertain, so I ran every result with a narrower and a wider edge as well.

I presented the results for discussion with the World Bank and am now sharing them with its Accra-based team. The same work produced prototype decision-support views that go from the national map down to the buildings at the flood edge in Weija Gbawe.

Fig. 1

Thirteen districts stay at the top of Ghana’s river flood ranking in all nine tests

How to read this: orange marks the 13 Act districts. Switch to damage or people to see why they lead, and choose “Accra to Keta” to zoom in. Tap any district, or pick one from the list, to read its figures.

Modelled river flooding for all 260 districts. Damage is to homes and their contents; people are those living inside the modelled 1-in-100-year flood.

Sources

My independent consultancy (2025–26), also my Oxford MSc dissertation. Hazard: JRC global river flood hazard maps v2 (CC BY 4.0). Buildings: Google Open Buildings v3. People: WorldPop (CC BY 4.0). Boundaries: OCHA/HDX COD-AB (Ghana Statistical Service).

Show the 13 Act districts as a table
Act districts: modelled river flood damage to homes and people exposed
DistrictRegionDamage to homes a year, GHS m (median)People in the 1-in-100-year flood extentNational rank across 9 combinationsClass
Ningo/PrampramGreater Accra631.047,6921st–3rdAct
Keta MunicipalVolta598.6112,2941st–3rdAct
South TonguVolta476.489,1132nd–4thAct
Ketu SouthVolta421.3101,7684th–6thAct
Weija Gbawe MunicipalGreater Accra414.451,1641st–11thAct
Ada EastGreater Accra371.663,1495th–6thAct
AnlogaVolta369.663,4814th–7thAct
North TonguVolta307.466,6727th–8thAct
Ada WestGreater Accra130.642,4928th–12thAct
Central TonguVolta107.827,7059th–17thAct
Shai OsudokuGreater Accra101.317,39210th–15thAct
ShamaWestern97.923,0309th–20thAct
AsuogyamanEastern70.915,55213th–19thAct

The full list, with the 13 districts to investigate next: flood-prone districts in Ghana. Who lives in the flood zone: people at risk of flooding in Ghana.

What can you do for a project in Ghana?

Six kinds of work: district and national flood risk screening, river hydrology and 1D–2D modelling, coastal extreme sea levels and inundation screening, risk information for early warning, option appraisal and funding, and decision-support views with training for the people who will use them.

Ghana, 260 districts

Screening

District and national flood risk screening

Which districts or sub-basins to look at first, for damage and for people, and which priorities still hold when the assumptions change.

  • Rankings tested under several assumptions
  • People, children and older people exposed
  • Checks against floods seen from satellites

Evidence: flood-prone districts in Ghana.

More
2D model, River Blithe

Modelling

River hydrology and 1D–2D modelling for a town or river reach

Design flows from short or patchy records, and a river model checked against a flood that really happened.

  • Flood frequency and rainfall–runoff
  • Linked 1D–2D or full 2D models at 10–30 m
  • TUFLOW and Flood Modeller; HEC-RAS 2D or SFINCS where they fit

Evidence: Hamstall Ridware. The hydrology was entirely my work; I built the 1D–2D model jointly with an Environment Agency modelling colleague.

More
50 years of river flows

Early warning

Risk information for early warning

The flood sizes, flood extents and counts of people a warning service needs before it sets its thresholds.

  • Return periods and exceedance probabilities
  • Who lives inside each size of flood
  • Checks against past floods

Evidence: the White Volta 2020 check, and ten incident weeks as a Flood Warning Duty Officer in south-east London.

More
Buildings flooded, by climate allowance

Appraisal and funding

Option appraisal, cost–benefit analysis and funding

Which option is worth paying for, and how to bring the money together from more than one source.

  • Options compared on one consistent basis
  • Damages including harm to mental health
  • Co-financing and partner contributions

Evidence: my own appraisal at Hamstall, and three council-led schemes in London funded in partnership, together est. over US$5.2m.

More
Accra to Keta

Decision support

Decision-support views and training

From 260 districts down to the buildings at the flood edge, with the uncertainty beside each figure, for the people who decide.

  • National and district views
  • Short lists that say what to do next
  • Hands-on sessions for the staff who use them

Evidence: prototype dashboard views for Ghana and for Weija Gbawe.

More

Can you model a specific river, town or coastal site in Ghana?

Yes. The national screen says where to look; a detailed model says what happens there. For a river or town I can build the hydrology and a linked 1D–2D model at 10–30 m. For the coast, the next stage after my screen is a 2D model at the priority sites, which has not yet been run.

At Hamstall Ridware in Staffordshire I did exactly this for one village below a reservoir. The hydrology was entirely my work, I built the 1D–2D model jointly with an Environment Agency modelling colleague, and I then appraised the options myself. The farmers built an earth bund.

In Ghana the screen points first to the lower Volta, the Keta lagoon and the Densu delta at Weija. A study there would need what the national maps leave out: releases from the Akosombo and Weija dams, lagoon outlets, surveyed floor levels and the communities’ own flood records.

More on these places: lower Volta flood risk and Ghana’s coast to 2050.

Do you work in Ghana or remotely?

Both. I do the analysis remotely from the UK, and travel for the parts that need people in the room: scoping meetings, field visits, community discussions, workshops and training. An assignment usually runs in five steps, from agreeing the decision to handing the results to the people who will use them.

Fig. 2

Five steps, each with an example from my own work

  1. Scope: start from the decision

    Which places, which decision, what data already exists. In Ghana the decision was where to look first, so a national screen was the right tool, not a detailed model.

  2. Screen: find where to look

    A district or basin screen from open data, tested under different assumptions. 260 districts, nine combinations, 13 that hold every time.

  3. Model: see what happens there

    A detailed model where the screen points, checked against a real flood. Hamstall Ridware: my hydrology and a 1D–2D model built jointly with an Environment Agency colleague.

  4. Decide: options and money

    Options compared on one basis, with costs, benefits and who pays. My own appraisal at Hamstall: on one consistent basis an earth bund scores about 4.6. Separately, the farmers built a bund of their own.

  5. Hand over: to the people who use it

    Documentation, data in open formats and hands-on sessions. So far: two internal Environment Agency courses, for 10 and 3 colleagues.

How to read this: the steps light up in turn; tap or tab to any step to read it.

Individual consultant
Contracted directly by a government agency, a development partner or an NGO for a defined task.
Key expert in a firm’s team
The flood risk, hydrology or modelling specialist in a consortium’s bid.
Remote, with visits
Based in the UK, never more than an hour from Accra time. Ghana work in 2025–26; available for West Africa and elsewhere.

Can you work on a World Bank, AfDB or GCF-funded project in Ghana?

Yes, as an individual consultant or as a key expert in a firm’s team. I presented my Ghana results for discussion with the World Bank and am now sharing them with its Accra-based team. That work was independent consultancy, not a World Bank contract, and it is not an official priority list.

For a bid, send me the terms of reference and the expert positions. I will tell you which ones my record fits, and send a CV in the format the client asks for, including World Bank and UN P11 formats.

The work fits the frameworks these projects report against. A national screen is “understanding disaster risk”, the first priority of the Sendai Framework, and disaster risk knowledge, the first pillar of Early Warnings for All.

Can you train staff at NADMO, GMet or a district assembly?

Yes, as part of an assignment. I would build the sessions around the agency’s own data and decisions: reading a flood map and its uncertainty, using return periods, and updating a district screen when new data arrives. My training record so far is two internal Environment Agency courses, for 10 and 3 colleagues.

How do we start?

Send the terms of reference, or a one-page brief if there are none yet. I will reply with how my experience fits each task, when I am available and a CV in the format your procurement needs. If the scope is still open, a short call usually settles it.

A useful brief answers five questions:

  1. Where? The districts, river basin or stretch of coast.
  2. Which decision? For example, choosing where to invest, setting warning thresholds or appraising a scheme.
  3. What data do you hold? River gauges, surveys, past flood records, earlier studies.
  4. When? The deadline and the number of input days.
  5. Who will use the results? So the outputs and any training fit them.

What should you not expect?

Good flood evidence says what it covers. These are the edges of mine.

A screen is a first stepA national or district screen says where to look. It does not say what to build, or whether one house will flood.

River flooding onlyThe national screen models rivers. Drainage flooding in towns, which causes most of central Accra’s floods, is outside it, so a zero there is not “no risk”.

The coast is a screenStatic connected-inundation screening with provisional forcing. No 2D coastal model has been run for Ghana yet.

Prototype dashboardsThe decision-support views are prototypes, not a live service.

Not officialIndependent consultancy, presented for discussion with the World Bank. Not an official priority list of the Government of Ghana or the World Bank.

Questions people ask

Are you based in Ghana?

No. I am based in the UK, never more than an hour from Accra time. I do the analysis remotely and travel to Ghana for the parts of an assignment that need it: field visits, workshops and training.

How much does a flood risk assessment cost?

It depends on the area, the data and the decision, so I agree a daily rate or a fixed fee after a short scoping call. For scale, my Ghana river screen would cost an est. US$90k if contracted externally, and the coastal screen an est. US$65k (benchmarked against comparable work).

Is your list of Act districts official?

No. It is my independent analysis, also my Oxford MSc dissertation, presented for discussion with the World Bank. It is not an official priority list of the Government of Ghana, NADMO or the World Bank. How the list was made.

Can the same method be used in Togo, Burkina Faso, Côte d’Ivoire or Nigeria?

Yes. Every input is open global data: JRC flood maps, Google Open Buildings, WorldPop and night-time lights. The numbers do not transfer between countries, but the method does, including the test of which priorities hold. Burkina Faso and Togo share the Volta basin with Ghana.

Which software do you use?

For river models, Flood Modeller and TUFLOW, in 1D and 2D; HEC-RAS 2D or SFINCS where a project calls for them. For national and coastal screening, Python, GDAL and QGIS, built on open data so a Ghanaian team could rerun it.

Can you review a flood model another consultant has built?

Yes. I can check the hydrology, the model build and how it was checked against observed floods, and say plainly whether the results support the decision they are being used for.

Sources

  1. Nuhu, H. (2026). National fluvial flood-risk assessment and priority stability under uncertainty in Ghana. MSc dissertation, University of Oxford. Independent consultancy, presented for discussion with the World Bank. Method and results.
  2. European Commission Joint Research Centre. Global river flood hazard maps, version 2 (CC BY 4.0). JRC data catalogue.
  3. Google Research. Open Buildings v3 building footprints. Open Buildings.
  4. WorldPop, University of Southampton. Gridded population, 2026 (CC BY 4.0). worldpop.org.
  5. Copernicus Emergency Management Service. Global Flood Monitoring, Sentinel-1 flood extent, September 2020. Global Flood Awareness System.
  6. Copernicus Climate Change Service. ERA5 hourly data on single levels, and global tide and surge water levels (GTSM). ERA5; water level time series.
  7. Fathom and University of Bristol. FABDEM v1-2, 30 m terrain (CC BY-NC-SA 4.0). Data record.
  8. Ghana Statistical Service / OCHA. Ghana subnational administrative boundaries (COD-AB). Humanitarian Data Exchange.

Work with me

Planning flood risk work in Ghana or West Africa?

Send the terms of reference or a short brief. I will reply with how my record fits, when I can start and a CV in your procurement’s format. Remote from the UK, or in-country when the work needs it.