Flood risk consulting for governments and development partners

I help governments, development banks, UN agencies and consulting firms work out where flood risk is highest, what would reduce it and how to pay for it. My evidence runs from all 260 districts of Ghana to a single village on the River Blithe in England.

T+79 h149 ha flooded

Real model output: a 1-in-100-year flood, plus 29% for climate change, spreading across the Hamstall Ridware floodplain in the first-generation 2022 model; 149 ha at its peak. Replayed, not to time scale. How to read this: drag the slider to move through the flood.

Animated map: in the 2022 model of a 1% AEP flood with a 29% climate allowance, water spreads over 79 hours to cover 149 hectares of the River Blithe and Trent floodplain at Hamstall Ridware, Staffordshire.

districts of Ghana screened for river flood risk, 2025–26
260
years at the Environment Agency, 2019–2025, about seven years in practice in all
6
incident weeks as a Flood Warning Duty Officer, south-east London
10
estimated value of council-led flood schemes I supported in London
over US$5.2m

What can I help with?

I offer six kinds of work, each backed by a project you can read about here: national flood risk assessment, river modelling, coastal screening, risk information for early warning, option appraisal and funding, and flood risk work in Ghana and West Africa.

2D model, River Blithe

Modelling

River hydrology and 1D–2D hydraulic modelling

Design flows you can defend, and river models checked against a flood that really happened.

  • Flood frequency and rainfall–runoff, with climate allowances
  • Linked 1D–2D or full 2D models at 10–30 m
  • TUFLOW and Flood Modeller; HEC-RAS 2D or SFINCS where they fit

Evidence: Hamstall Ridware. The hydrology was entirely my work; I built the 1D–2D model jointly with an Environment Agency modelling colleague.

More
566 km of coast

Coast

Coastal extreme water levels and inundation screening

How high the sea can reach once tide, storm surge and waves add up, and which low ground connects to it.

  • Return levels with their uncertainty
  • Sea-level rise and stress tests
  • Screening that picks the sites worth a 2D model

Evidence: Ghana’s coast, a static screening with provisional forcing, not a 2D model.

More
50 years of river flows

Early warning

Risk information for early warning

From “how much rain” to “who will be affected”: the numbers a warning service sets its thresholds with.

  • Return periods and exceedance probabilities
  • Frequency–severity curves for damage and people
  • Checks against past floods, such as the White Volta in 2020

Evidence: ten incident weeks as a Flood Warning Duty Officer, south-east London.

More
Buildings flooded, by climate allowance

Appraisal and funding

Option appraisal, cost–benefit analysis and funding

Which option is worth paying for, and how to put the money together from more than one source.

  • Options compared on one consistent basis
  • Damages including harm to mental health
  • Partnership funding and co-financing

Evidence: my own appraisal at Hamstall (an earth bund, benefit–cost ratio about 4.6 on one consistent basis) and three council-led schemes in London funded in partnership, together est. over US$5.2m.

More
Accra to Keta

Ghana and West Africa

Flood risk consultant for Ghana and West Africa

Independent flood risk work that starts from a national picture already built: all 260 districts, the river and the coast.

  • District and basin screening, river and coastal
  • Detailed studies where the screen points
  • Training as part of an assignment

Evidence: Ghana flood risk, presented for discussion with the World Bank.

More

How does a flood risk assessment work?

It follows the water to the decision. First where floods go and how often, then who and what is in the way, then how much harm each depth does. Together those give the risk, with its uncertainty. The last step is the one that matters: what to do first, and how to pay for it.

Fig. 1

Five steps, each with an example from my own work

  1. Hazard: where the water goes

    How deep, how far and how often. Ghana: flood maps for five flood sizes, 1 in 10 to 1 in 500 years. Hamstall: a 1D–2D model of the River Blithe.

  2. Exposure: who is in the way

    Homes, people and assets inside each flood. 1.18 million people inside Ghana’s modelled 1-in-100-year flood.

  3. Vulnerability: how much harm

    The damage a given depth does to a home, and to the people in it. Three damage curves for Ghanaian homes; harm to mental health counted at Hamstall.

  4. Risk: harm and how likely it is

    Averaged over the years, with the uncertainty shown. About GHS 5.19 billion a year in Ghana, between 2.93 and 7.33 billion depending on the flood edge.

  5. Decision: what to do first

    A short list, the options and the funding. 13 Act districts in Ghana; an earth bund the farmers built at Hamstall.

How to read this: the steps light up in turn; tap or tab to any step to read it.

Do you work for clients in England?

Yes. I spent six years at the Environment Agency (2019–2025): flood modelling and hydrology in the West Midlands, then planning advice and partnership funding in London. I can now help consultancies, councils, landowners and developers in England, remotely or on site.

Fig. 2

What a village flood model shows: more homes flood as the climate allowance grows

How to read this: each bar is one flood in the 2024 Hamstall Ridware model; the gauge on the right (wide screens) or the readout (phones) shows the deepest water at any building. Tap a bar or a button to step through.

Buildings flooded in the 1-in-100-year flood, with the 2020s, 2050s and 2080s climate allowances, and in the 1-in-1,000-year flood.

Show the data as a table
Hamstall Ridware, 2024 model: buildings flooded as the climate allowance grows
FloodBuildings floodedDeepest at a building, m0.1 m or deeper0.3 m or deeper
1% AEP flood (1 in 100)140.1310
1% AEP + 15% (2020s allowance)160.2480
1% AEP + 17% (2050s allowance)190.3191
1% AEP + 29% (2080s allowance)210.3491
0.1% AEP flood (1 in 1,000)290.46175

How do you work with task teams and consulting firms?

As an individual consultant, or as a specialist or key expert in a firm’s team. Home-based or in-country, short-term or on a framework call-off. I can provide a CV in World Bank, ADB or UN P11 format.

Individual consultant
Contracted directly by a government, a development bank or a UN agency, for a defined task.
Key expert in a firm’s team
The flood risk, hydrology or modelling specialist in a consortium’s bid, with a CV in the client’s format.
Remote or in-country
Based in the UK. Ghana work in 2025–26; available for West Africa and elsewhere.
Training as part of the work
Hands-on sessions so the people who will use the results can run them. So far: two internal Environment Agency courses, for 10 and 3 colleagues.

Questions people ask

Can you join a consulting firm’s bid as a key expert?

Yes. Send me the terms of reference and the expert positions. I will tell you which ones my record fits and send a CV in the format the client asks for.

Do you work in-country?

Yes, for the parts of an assignment that need it, such as field visits, workshops and training. The analysis itself I usually do remotely from the UK.

Which software do you use?

For river modelling, Flood Modeller and TUFLOW, both 1D and 2D; HEC-RAS 2D or SFINCS where a project calls for them. For national screening and coastal work, Python, GDAL and QGIS, built on open data. I was also an operational user of the Environment Agency’s flood forecasting system as a duty officer.

Is the Ghana coastal work a 2D model?

No. It is a static screening of the low ground connected to the sea, with provisional forcing. Its job is to find the places that deserve a 2D hydrodynamic model, which is the next stage. My 2D modelling experience is on rivers, at Hamstall Ridware.

Can you review a flood risk assessment for a planning application in England?

Yes. I advised on planning applications at the Environment Agency in London from 2023 to 2025, and I can review an assessment before you submit it or after an objection. Flood risk assessment reviews.

Who has seen your Ghana results?

I presented the results for discussion with the World Bank and am now sharing them with its Accra-based team. The work is independent consultancy, and the river part was also my Oxford MSc dissertation. It is not an official priority list.

Work with me

Have terms of reference to hand?

Send them over. I will reply with how my experience maps to each task, when I am available and a CV in the format your procurement needs.